Energy & Renewables — Zambia
Closing SoonGT-2026-015· Listed Jan 22, 2026

Zambia Copperbelt Solar Mini-Grid & Mining Power Reliability

180 MW solar-plus-storage portfolio stabilising grid reliability for copper mining and surrounding communities.

Zambia · Africa Energy & Renewables Project Finance — Senior Debt Closes Jul 31, 2026
Raise Target
$110.0M
Committed
$94.0M
Min Ticket
$2.0M
Target Return
13–15% IRR
Horizon
10–12 yrs
85% subscribed · $16.0M remaining

Executive Summary

Deployment of 180 MW of solar generation and 60 MWh battery storage across four sites on the Copperbelt, addressing chronic load-shedding that constrains copper production and household electrification. Power is sold under a blended PPA structure to a national utility and two mining offtakers.

Investment Thesis

  • National grid load-shedding has cut copper output by an estimated 8% annually — reliable power is the binding constraint on export earnings.
  • Blended PPA with mining offtakers at commercial rates cross-subsidises utility-scale tariff affordability.
  • Battery storage enables firm capacity commitments, unlocking capacity payments beyond energy sales.

Use of Funds

Solar PV construction (4 sites)45%
Battery storage systems30%
Grid interconnection upgrades15%
Contingency & reserves10%

Financial Snapshot

Annual revenue (post-COD)
USD 42.3M
DSCR (base case)
1.59x
Equity IRR (base case)
14.1%
Payback
7.8 yrs

Transaction Structure

USD 82M senior debt (DFI club), USD 28M sponsor equity. Deal Room slice in senior debt tranche.

Risk & Mitigation

Key Risks
  • · Utility payment timeliness
  • · Currency devaluation risk
  • · Mining offtaker commodity cycle exposure
Mitigants
  • Partial risk guarantee from multilateral agency on utility payment obligations
  • USD-denominated PPA with local-currency pass-through mechanism
  • Mining offtake contracts fixed regardless of copper price

Timeline & Milestones

  1. 2025 Q1
    PPA execution with utility and miners
  2. 2025 Q3
    EPC contractor selection
  3. 2026 Q1
    Senior debt commitment
  4. 2026 Q3
    Financial close
  5. 2027 Q4
    Full commissioning across four sites

Sponsor

Copperbelt Power Partners

Copperbelt Power Partners is a Zambian-South African renewable energy developer with 340 MW of operating solar assets across Southern Africa.

ESG & Impact

  • Avoids ~410,000 t CO₂/yr vs. diesel backup generation
  • Displaces load-shedding for 60,000 households
  • Local content requirement of 35% on construction

Data Room

Investor Teaser
PDF · 14 pp
Information Memorandum
PDF · 88 pp
Verified Access
Financial Model
XLSX
Verified Access
PPA Term Sheets
PDF
Verified Access

Gated documents unlock after KYC/AML verification and NDA execution.

Related Opportunities

More in Africa / Energy & Renewables

Back to Deal Room